1
/
of
6
Blue Ox
Blue Ox BX88272 Mini Fuse Bypass Switch Long Lead
Blue Ox BX88272 Mini Fuse Bypass Switch Long Lead
Regular price
$74.40 USD
Regular price
Sale price
$74.40 USD
Unit price
/
per
Shipping calculated at checkout.
❓
Confirm Vehicle Fitment:
Select your truck in My Garage to guarantee 100% bolt-on compatibility.
Couldn't load pickup availability
Blue Ox BX88272 Mini Fuse Bypass Switch Long Lead — Engineered by Blue Ox for premium performance, rugged durability, and guaranteed vehicle compatibility. Built to meet or exceed rigorous automotive standards.
Key Features & Specifications:
- Authentic Blue Ox Craftsmanship: 100% genuine manufacturer product built from industrial-grade materials.
- Engineered Precision Fit: Designed for seamless integration with factory mounting points and electrical systems.
- All-Weather Protection & Durability: Resists road salt, UV radiation, extreme temperature fluctuations, and severe off-road conditions.
- Turnkey Shop Installation Available: Professional in-house installation and alignment available at Truck Guy Upfitters (510 W North 1st St, Seneca, SC 29678).
- Manufacturer Warranty: Backed by full authorized Blue Ox warranty protection.
Detailed Product Overview:
MINI FUSE BYPASS SWITCH LONG LEAD
Note: Images may be representative and not exact.
Product Details:
- Brand: Blue Ox
- Part Number / SKU: BX88272
- Fitment Application: Vehicle Specific / Universal Upfit
Shipping & In-Store Seneca Pickup
Shipping & In-Store Seneca Pickup
Fast Shipping & Local Seneca Pickup:
- Standard ground and freight shipping available nationwide with carrier tracking.
- Free In-Store Pickup: Select store pickup at checkout for immediate retrieval at our Seneca, SC shop (510 W North 1st St, Seneca, SC 29678).
- Professional Installation: In-house certified installation and electrical upfitting available.
Fitment Guarantee & Warranty
Fitment Guarantee & Warranty
Truck Guy Upfitters Guaranteed Fitment:
- 100% genuine authorized manufacturer parts backed by manufacturer warranty.
- Have questions regarding your exact truck year, sub-model, or bed length? Contact our upfit team for direct fitment verification.
Share
